Skip to content
NR Storage Systems
Category 03 · 37 items

Spares, Consumables & Services

The recurring half of the catalog, and the work we do on site.

01 · 8 items

Packaging consumables

Bought by the roll, used by the shift.

  • Stretch film

    Stretch film

    Supplied

    Also called: wrapping roll, pallet wrap

    Hand or machine grade · 12–35 micron · pre-stretched options

    Machine film at higher pre-stretch uses far less material per pallet than hand film. The saving is usually larger than expected.

  • Packing tape

    Packing tape

    Supplied

    BOPP, paper or reinforced · printed options

    Tamper-evident and printed tape for e-commerce dispatch.

  • Strapping

    Strapping

    Supplied

    PP, PET or steel · with seals and buckles

    PET has largely replaced steel for palletised loads — safer to cut and no corrosion.

  • Bubble wrap, foam & air pillow

    Bubble wrap, foam & air pillow

    Supplied

    Rolls, sheets and on-demand systems

    On-demand systems save the storage volume that pre-inflated material consumes.

  • Corner board & edge protector

    Corner board & edge protector

    Supplied

    Cardboard or plastic angle

    Spreads strapping tension and protects the load edge. Cheaper than the damage it prevents.

  • Kraft paper & void fill

    Kraft paper & void fill

    Supplied

    Rolls and dispensers

    The recyclable alternative to plastic void fill.

  • Stretch hood & shrink film

    Stretch hood & shrink film

    Supplied

    Machine-applied hooding

    Weather protection for outdoor-stored pallets.

  • Desiccant & VCI packaging

    Desiccant & VCI packaging

    Supplied

    Silica gel, clay, VCI film and paper

    Monsoon shipping and export of ferrous parts.

02 · 10 items

Racking components & spares

Damaged parts are replaced, not straightened. A bent upright has no known rating.

  • Beam / load beam

    Beam / load beam

    Manufactured

    Box, step or C-section · to length and load

    Beam profile and connector must match the upright system. Mixing manufacturers' components is a common and unsafe shortcut.

  • Upright frame & column

    Upright frame & column

    Manufactured

    Various depths and section profiles

    Replacement is a controlled operation — the run is unloaded or propped before the frame comes out.

    Our line: Heavy Duty Pallet Rack →
  • Shelf panel & decking replacement

    Shelf panel & decking replacement

    Manufactured

    Ply, MS panel, mesh deck, chipboard

    The most frequently replaced item in a shelving system.

  • Beam safety pin & lock

    Beam safety pin & lock

    Manufactured

    One per beam end

    The cheapest component in the system and the most commonly missing one.

  • Anchor bolt & fixing

    Anchor bolt & fixing

    Supplied

    Mechanical or chemical anchors

    Specified from the slab thickness and the pull-out load, not from habit.

  • Footplate & base plate

    Footplate & base plate

    Manufactured

    Bolted to the upright · anchored to slab

    Distributes the column load into the slab. Anchoring is not optional.

  • Horizontal & diagonal brace

    Horizontal & diagonal brace

    Manufactured

    Welded or bolted bracing

    Bracing is what gives the frame its stiffness. A missing brace is a structural defect, not a cosmetic one.

  • Slotted angle, nuts & bolts

    Slotted angle, nuts & bolts

    Manufactured

    Angle sections, fasteners, corner plates

    The consumable side of a bolted racking system.

    Our line: Slotted Angle Rack →
  • Row spacer & run tie

    Row spacer & run tie

    Manufactured

    Ties back-to-back runs

    Holds the flue space open and stabilises the pair as one structure.

  • Shim & levelling plate

    Shim & levelling plate

    Manufactured

    Galvanised, various thicknesses

    Out-of-plumb frames lose capacity rapidly. Shimming is part of a correct install.

03 · 12 items

Services

Delivered by our own people from Bhiwandi, Mumbai, Bangalore and Hyderabad.

  • Site survey

    Site survey

    To order

    Same working day across Mumbai, Bangalore and Hyderabad

    Measures the building, the stock profile and the handling equipment. Everything else follows from it, and it costs nothing.

  • Rack safety inspection

    Rack safety inspection

    To order

    Annual survey with damage classification and report

    Green, amber and red classification with a repair schedule against each finding.

  • Repair & component replacement

    Repair & component replacement

    Manufactured

    Uprights, beams, braces and footplates

    Damaged components are replaced, never straightened.

  • Installation

    Installation

    To order

    Own crews · phased around live operations

    Most installations happen in a working warehouse. Phasing is planned so dispatch never stops.

  • Reconfiguration & retrofit

    Reconfiguration & retrofit

    To order

    Beam pitch changes, added levels, decking changes

    Changing beam pitch changes the upright's rated capacity — the recalculation comes with the work.

  • Relocation & re-erection

    Relocation & re-erection

    To order

    Dismantle, transport, re-survey and re-install

    Racking is an asset that moves with a lease. Re-erection includes a fresh load-notice calculation for the new layout.

  • Annual maintenance contract

    Annual maintenance contract

    To order

    Also called: AMC

    Scheduled inspection, spares and priority response

    Fixed-cost cover for operations that cannot carry an unplanned rack failure.

  • Warehouse layout design

    Warehouse layout design

    To order

    CAD layout with pallet positions, aisles and flow

    Capacity, throughput and truck paths modelled before steel is cut.

  • Capacity & storage study

    Capacity & storage study

    To order

    SKU profiling, slotting and cube utilisation

    Frequently finds 20–30% more capacity in an existing building without new racking.

  • Structural design & load calculation

    Structural design & load calculation

    To order

    Frame, beam and mezzanine calculations

    Signed calculations for the loads stated on the load notice.

  • Manufacturing

    Manufacturing

    Manufactured

    Cut, form, weld, powder-coat and load-test at Bhiwandi

    One facility, one quality standard, no trading of another manufacturer's steel.

  • Operator & safety training

    Operator & safety training

    To order

    Safe loading, damage spotting, inspection routine

    Delivered on your floor with your racking, not in a classroom.

04 · 7 items

Cleaning & facility maintenance

A clean floor is a safety measure. Sweeping does not scale.

  • Ride-on scrubber drier

    Ride-on scrubber drier

    Supplied

    Battery · 1,000–5,000 m²/hr

    The economic answer above roughly 5,000 m² of floor.

  • Walk-behind scrubber & sweeper

    Walk-behind scrubber & sweeper

    Supplied

    Battery or mains

    Mid-size floors and aisles a ride-on cannot enter.

  • Industrial vacuum

    Industrial vacuum

    Supplied

    Wet and dry · HEPA options

    Dust control in food, pharma and electronics areas.

  • High-pressure washer

    High-pressure washer

    Supplied

    Cold or hot water

    Dock aprons, yards and washdown areas.

  • Manual cleaning equipment

    Manual cleaning equipment

    Supplied

    Trolleys, mops, squeegees, brooms, signage

    Colour-coded by zone in food and pharma sites to prevent cross-contamination.

  • Waste handling & baler

    Waste handling & baler

    Supplied

    Cardboard and film balers, compactors

    Turns waste volume into a recyclable revenue stream instead of a floor-space problem.

  • Pest control equipment

    Pest control equipment

    Supplied

    Bait stations, insectocutors, monitoring

    Audit requirement in every food and pharma warehouse.

Our lines in this category

What we manufacture here.

Industries that specify from this category

Tell us what you store. We’ll tell you how to store it.

Supply and fitting across India, with same-day site surveys in Mumbai, Bangalore and Hyderabad. No obligation, and no boilerplate quote.